Planning a New Deck in Colorado Springs? What the Updated Wildfire Rules Mean for You
When you picture your new deck, you probably think about summer dinners, comfortable seating, and a place to enjoy your backyard. Choosing the size, layout, and materials is part of the fun.
For some Colorado Springs homeowners, planning also needs to include the city’s Wildland-Urban Interface requirements, commonly called WUI rules. These requirements can affect the materials used for your deck stairs, details beneath or around the structure, and the landscaping near your project.
(DBS does not perform landscaping or wildfire mitigation work required by the fire department. If a project requires vegetation or tree removal, tree trimming, or other landscape changes, the homeowners will need to contract with a landscaper or perform the work themselves.)
What are the WUI Rules?
The Wildland-Urban Interface is where homes and other developments meet or intermingle with vegetation that can fuel a wildfire.
Colorado Springs updated its wildfire requirements through Ordinance 26-18, replacing Appendix K of the city’s Fire Prevention Code. The update was developed to meet Colorado’s wildfire resiliency framework and includes a locally developed wildfire risk map.
For a homeowner planning a deck now, the practical question is which requirements apply to your address and proposed project.
Your New Deck May Need Different Materials Than Your Existing One
If you are replacing an older deck, you may expect to use the same types of boards. Under the updated wildfire requirements, we need to verify if your property is in a WUI zone.
An existing wood deck – or a neighbor’s that was built even a couple years ago – does not establish what will be approved for your new project. Your property’s wildfire classification and the work you are planning determine the applicable material requirements.
As a deck contractor, we discuss material options with our clients so they can choose the appearance and maintenance level they want while meeting the requirements determined by the fire department.
Why do WUI Rules Focus on Decks?
A deck creates a large horizontal surface where windblown embers can collect.
During a Colorado Springs Fire Board of Appeals discussion, a fire official explained that experience from the Waldo Canyon Fire helped shape the city’s restrictions. Embers collected on decking surfaces, burned, and contributed to homes catching fire. The official distinguished those walking surfaces from vertical and structural members (such as the deck framing), which are less susceptible to collecting embers. Fire Board of Appeals Minutes
That helps explain why a deck’s components may have different material requirements.
The boards you walk on, stair treads, support framing, railings, and any overhead cover each serve a different purpose. Approval of one material does not automatically resolve the requirements for the complete structure.
Your Address is the Starting Point
Before making final design and material decisions, confirm whether your property is within Colorado Springs city limits and whether it falls inside a designated WUI zone.
Colorado Springs uses Class I and Class II wildfire risk categories. Those classifications determine applicable construction and vegetation-management requirements. The city provides wildfire risk information and contacts for questions about individual properties. Colorado Springs Springs View Map
A Colorado Springs mailing address alone does not confirm that city rules govern your property. Homes in unincorporated El Paso County or another jurisdiction may have different requirements.
When you contact us about your deck project, we will start with your address and a few details about what you have in mind. Are you replacing an existing deck, making it larger, adding stairs, or planning a cover? This information helps us check whether your property falls within a designated risk area and determine which material requirements apply to your project.
What Does This Mean for Your Decking Choices?
For Class II unenclosed decks, the current code addresses both the deck surface and stair treads. It specifies Class A rated material, allows composite decking with a minimum Class B rating as an exception, and provides an ignition-resistant-material option. It prohibits wood decking surfaces while permitting wood for large structural components and railing. Current Appendix K, Wildland Urban Interface Requirements
The important part to remember is that the EXACT product matters.
“Composite decking” describes a category of products. It does not, by itself, establish that a particular board meets the requirements for your project.
As we discuss options, the proposed manufacturer and product line should be identified clearly and early in the timeline. Supporting product documentation needs to match the material that will actually be installed.
You can still consider appearance, maintenance, and budget. Those choices simply need to be made among products approved by the Pikes Peak Regional Building Department (PPRBD).
Does Every Part of the Deck Have to be Composite?
The rules distinguish between walking surfaces and other components.
The Class II decking provision allows wood for large structural components, such as the framing, and railings, even though the wood is prohibited for the decking service. This does not mean every wood component is automatically acceptable in every design; the complete project still needs to meet applicable requirements. (Current Appendix K, Section K109.2.7)
For homeowners, that means a deck may combine different materials. The walking surface may use one approved product while framing or railings use another material appropriate to their function.
Your construction proposal should make those choices clear. You should know what will be used for the deck boards, stairs, framing, railings, and any cover before committing to the project.
The Area Underneath Your Deck May Need Changes
A wildfire review includes the area below and immediately around the deck.
Both wildfire classes contain immediate-zone requirements calling for noncombustible surfaces such as gravel, rock, concrete, or pavers. The vegetation provisions include specified exceptions such as approved low-flammability plants.
This can affect a backyard that currently has bark mulch, shrubs, or other landscaping in the proposed deck location.
For example, you may want to build a deck over an existing plant bed. The construction design and the condition of that planting bed should both be reviewed before work begins.
We do not remove vegetation, replace landscaping, install landscape ground coverings, or perform mitigation work. Any required work of that kind is the responsibility of the homeowners and must be arranged separately from our deck construction.
Before accepting a landscape estimate, make sure the provider understands the requirements identified for your property. A general yard cleanup may not address everything needed for approval.
Required Yard Work May Extend Beyond the Deck
For additions and alterations, Appendix K applies fuels and site-management requirements within a 30-foot radius of the work’s perimeter, or to the property line if closer, according to the parcel’s classification.
In plain language, a deck project may require attention to landscaping outside the area directly underneath it.
If you are expanding a deck farther into the back yard, ask the fire department where the applicable area will be measured from and what existing vegetation needs attention.
Do this early. Landscaping requirements can affect your overall budget and the timing of required inspections.
Do not assume every nearby tree must be removed. Have the actual conditions reviewed, including any applicable exceptions, before authorizing major cutting or landscape changes.
Once the required work is identified, you can decide whether to handle it yourself or hire a separate provider.
What if I Want a Covered Deck?
A covered deck introduces additional construction details.
Class II provisions expressly address patio and deck covers. Appendix K also contains requirements concerning underfloor enclosures and projections. (Appendix K, Sections K109.2.1, K109.2.6, and K109.2.8)
Tell us at the beginning if you want a roof or another overhead feature. Adding a cover changes the design that needs to be evaluated.
The plans should address the complete structure, including its supports, connection to the home, underside, and applicable protection details. Choosing approved deck boards is only one part of that process.
Construction details included in our agreement should also be distinguished from separately required landscaping. That distinction helps you understand what our price covers and what you need to arrange elsewhere.
Replacing an Old Deck Will Also Trigger Review
Homeowners sometimes assume that rebuilding a deck in the location allows them to use the same materials and construction details.
That should be confirmed before work begins.
The Class II provisions identify alterations to the main structural members and repair or construction requiring a PPRBD permit as triggers for existing decks. The ordinance also defines deck maintenance as like-for-like replacement of work or defective walking-surface parts without changing the footprint. (Ordinance 26-18, Sections K102.1 and K109.2.1)
Replacing a few damaged parts and rebuilding an entire deck are different scopes of work. Describe exactly what you intend to remove, retain, and rebuild.
Do not reply on the word “repair” to establish an exemption. The proposed work needs to be evaluated on its actual scope.
Landscaping Can Affect the Project Schedule
Applicable Class II projects have review and inspection requirements that can include preconstruction fuels review and a final fire inspection. The specific stages for your deck should be confirmed with the responsible officials. (Ordinance 26-18, Section K101.7)
This makes coordination important when required landscaping is being completed separately.
Before construction is scheduled, establish:
- What mitigation or landscaping work is required
- Who will perform that work
- When it must be completed
- Which approvals or inspections depend on it.
Give your landscape provider the relevant requirements and arrange their schedule accordingly. If an inspection requires work that has not been completed, the project may need additional coordination before it can move forward.
Homeowner-arranged landscaping and mitigation should have their own clear scope and schedule.
Budget for the Complete Project
When planning your investment, think about the total cost of reaching an approved, completed project.
Our deck proposals cover the construction work identified in the agreement. Depending on your property, your budget may also need to include required tree removal or trimming, vegetation removal, mulch replacement, ground treatment, or other mitigation work.
Obtain pricing for those items once the requirements are known. This gives you a more useful picture of the project than considering the deck construction price alone.
It also lets you make design decisions with better information. If you are comparing two deck sizes or layouts, consider any associated landscape work alongside the construction costs of each design.
Start Your Deck With a Clear Plan
Your new deck should fit the way want to use your home and backyard. Understanding wildfire requirements early helps you choose appropriate materials, prepare for approvals, and account for any separate landscape work.
When you contact us, share your address and your ideas for the deck. Together, we can discuss the construction scope and the decisions that need to be resolved before building begins.
If the fire department requires landscaping or mitigation, you will arrange that work independently. With both the construction and homeowner responsibilities clearly understood, you can plan your project with a more complete budget in mind.
Where Can You Get Property-Specific Answers?
Wildfire construction questions – Colorado Springs Construction Services – 719-385-5982
Vegetation & mitigation questions – Wildfire Mitigation Unit – 719-385-7342
Building permit questions – PPRBD – 719-327-2880